Ron Janis and the Private Sewer and Water Corp just keep racking up the BBB complaints. They added a new one on 3/31. Sounds awfully familiar to what they pulled on me.
ComplaintSEWER PIPE FROM THE HOUSE TO THE STREET HAD TO BE
REPLACED WHICH I HAVE NO COMPLAINT FOR
BUT PART OF THE CONCRETE DRIVEWAY HAD TO BE CUT
AWAY. NOW I HAVE A 2 FOOT DEEP HOLE SITTING HERE
THIS WAS DONE FIRST PART OF SEPTEMBER-NOW IT IS
November,3 MONTHES LATER
I HAVE BEEN CALLING THE COMPANY--PRIVATE SEWER & WATER I HAVE BEEN CALLING ALMOST EVERY DAY AND I
AM GIVEN SOME KIND OF EXCUSE OR SOMETIMES THEY
GIVE ME A TIME AND DAY--I CALL THEM EACH TIME
AND AM TOLD THEY WILL BE THERE SHORTLY
Desired SettlementALL I WANT IS THE DRIVEWAY TO BE FINISHED SO I CAN
DRIVE INTO THE GARAGE AND NO ONE WILL FALL IN
Final Consumer Response
Information received from Complaint #XXXXXXXX:
SEP 11 I HAD HOME SEWER PIPES REPLACED DUE TO ROOTS.PORTION OF THE DRIVEWAYHAD TO BE DUG UP. THE JOB WAS FINISHED AND I PAID $13,981.53. *** ***** THE OWNER SAID WILL BE BACK IN A DAY OR SO TO RE-CONCRETE THE DRIVEWAYI HAD TO MAKE A CALL EVERY FEW DAYS TO FINISH THE WORK. EACH TIME WAS A DIFFERENT EXCUSE. I SAT HERE WITH A HOLE IN THE DRIVEWAY TILL NON 21.OCT 3 *** ***** ASKED FOR $1500.00 FOR BOND AND PERMIT,PROMISING HE WILL RETURN $1000.00 WHEN ADDISON APPROVES THE JOB. END OF DECEMBER RO TOLD MEHE GOT THE $1000.00 AND WILL RETURN ITI AM STILL WAITINGNOV 21 THE CEMENT TRUCK CAME, *** CALLED ME AND HE HAD TO GO OUT OF TOWN,ASKED ME TO GIVE HIS EMPLOYEE A CHECK FOR $885.60 TO GIVE THE TRUCK DRIVER AND HE WOULD PAY ME BACK. JUST BEFORE CHRISTMAS I GET A LETTER FROM MOHR STATING THE CHECK FROM PRIVATE SEWER & WATER WAS RETURNED FROM THE BANK MARKED NSF AND A LIENWOULD BE PLACED AGAINST MY PROPERTY SINCE I WAS THE OWNER,I WENT TO MOHRAND PAID $516.93 PLUS $30.00 NSF PENALTY.I CALLED *** EVERY FEW DAYS, I TOLD HIM I WILL COME TO HIS OFFICE TO PICKUP A CHECK. I ASKED HIM WHEN AND WE AGREED TO DATE/TIMETHIS HAPPEND 3 TIMES I DON'T THINK HE HAS ANY PLANS TO PAY ME. EVERYTIME I TALK TO HIM HEHAS A DIFFERENT EXCUSE.
DesiredSettlementID: Refund
ALL I WANT IS THE MONEY HE OWES ME BOND=$1000.00 MONEY SUPPOSEDLY GIVEN TO THE CEMENT TRUCK DRIVER=$885.60 PAYMENT MADE TO MOHR CONCRETE=$516.93 NSF PENALTY=$30.00 TOTAL OWED ME===$2,432.53